Introduction
Kushinagar: Important Buddhist
pilgrimage centre Home to several temples, stupas and shrines Lack of connectivity reduces tourist inflow
UP Khushinag ar
The Project
Development of International Airport 5 Km. from
Kushinagar,U.P Development of Buddhist Circuit integrating 5 Buddhist centres EIA Consultant: SENES (Specialists in Energy, Nuclear and Environmental Sciences) Submitted by Department of Tourism, Govt. of Uttar Pradesh. Submitted to MoEF
Objectives of Study
To describe the proposed project and identify the
development requirements Identify the social and environmental elements likely to be affected To identify the negative impacts and give mitigation measures To design and specify the necessary monitoring requirements
M e t h o d o l o g y
Screening
Scoping
Preparation of EIA
Approval
Screening
Proposed site surrounded by agricultural land and
villages Existence of 3 water bodies near the site Presence of buddhist monuments within 5 Km. radius Total Land Requirement : 754 Acres Land required for project to be taken from 12 villages Water used : Approx.460 KLD; Waste Water :
Approx. 350 KLD Solid Waste : Approx. 2 TPD Power Back up : DG Sets No. of Trees to be cut : Approx. 300
SCOPING
Assessing the Environment
Component
Air environment Water Environment
Assessed Parameters
Climate and Air Quality Parameters Water Resources and availability Water Quality Parameters
Objective of Assessment
To study the availability of water and possible impacts on availability and quality of water To analyze impacts on land use due to project and mineral resources Assess the vegetation type (qualitative and quantitative)
Land Environment
Ecological Environment
Forest and Non Forest Vegetation Mammals and Reptiles Water Bodies and Aquatic Flora and Fauna
Assessed Parameters Forest and Non Forest Vegetation Mammals and Reptiles Water Bodies and Aquatic Flora and Fauna
Objective of Assessment Identify common flora & fauna Find out any rare and endangered plant species Evaluate wildlife habitat of the area Identify and assess aquatic ecology Impact on people of the villages, their physical and psychological health and wellbeing, economic facilities, heritage, culture, lifestyle and other
Socio-Economic Environment
EIA Preparation
Feasibility Study : Environment Monitoring Plan
Impact Analysis : Preconstruction, Construction and Operation Phases
Mitigation measures : Construction and Operation Phases
Impact Management
Land, Water, Air, Noise, Ecological. SocioEconomic, Cultural (Heritage) Analysis of Alternatives
Impact Prediction/Analysis
Pre Construction Phase
Relocation: National Policy on Rehabilitation and
Resettlement, 2007; employment, livelihood compensation, skill development programs, alternate connectivity. Land Use Change : Loss of agricultural land (hence no major impact)
Construction Phase Operation Phase
Impact Prediction/Analysis
Impacted Environments Physical Land Construction Phase Procurement, Transportation, Leveling, Filling, Waste Disposal Imperviousness, Water contamination, Increased Runoff, Hazardous material Spillage, Labor Activiies Base Data, ISCsT-3 (Dust Control Plan ,reduce SPM) Base Data, DHAWANI ( Noise receptors at 122-15 mts) Minimal : Aquatic Flora Fauna Severe, Moderate : Terrestrial Flora, Fauna Loss of Land, Livelihood Loss, Economics of Agriculture Loss, Immediate livelihood loss, Vulnerable Population, Community structure, Noise-Dust Operation Phase Land Use, Soil Degradation
Water
Increased Water requirement, Water Balance Cycle (Down cycling/Recycling) Emission by DG set operation, Increase in vehicular traffic Integrated Noise Model (Noise contours; day/night, arrival/Departure Minimal : Aquatic Flora Fauna Severe, Moderate : Terrestrial Flora, Fauna Severe: Avifauna Regional Development, Employment, Revenue to Govt., Access to Utilities
Air Noise
Ecological
SocioEconomic
Local People
Mitigation Measures
Mitigated Environments
Physical Land
Construction Phase
Soil Conservation, Soil Erosion Measures, Waste Management Plan
Operation Phase
Solid waste treatment and disposal
Water
Air
Noise
Heritage Sites
Reporting Schedule
Emergency Measure
Budgetary Provisions
Impact Management
Public Consultation
Public hearing State pollution control Board
Risk Assessment
Identification of potential hazards Fuel Storage at airport
Thank You