TTCS overall progress, component progress & safety
Contents
System design
Box design
TTCS Start-up
Condensers Evaporator
Component progress
Pump status
Valves, APS/DPS
Evaporator Condenser (freezing) Heat Exchanger OHP Pre-heaters Accumulator
Safety status
4
Progress
Bolt sharing with a.o. main radiator bracket solved New draft mechanical box design available detailing on-going
10
11
TTCS Start-up
Actions to tackle start-up problem decided on TWG meeting at NLR
Investigate possible super-critical pump start-up (PDT/NLR/CAST) Start-up analyses of orbital cases (SYSU/CGS)
Start-up radiator design decisions Investigation of severity of the problem (b-angles)
12
Super-critical start-up
PDT pump tests are being performed right now
Pressure head measurements suction capability with air or vapour Design is based on the MER-rover pump which has
Accumulator transition tests from super- to subcritical state will be implemented in EM testing to
13
by SYSU/CGS
Assumptions:
Hot and coldest case orbital data selection by JS. AMS start-up configuration New box lay-out with start-up radiator
start-up radiator white-painted side walls covered by MLI
14
15
16
17
18
capabilities
No freezing problem is present in the box with the start-up radiator Always one TTCS-loop able to start-up in AMS startup configuration Additional analyses required for start-up in AMS-on configuration
Component Status
Pump (PDT)
Design Review at PDT
Electronically pump design is progressing well Motor design mature (proven design) BBM curve test performed
pump can deliver more flow then required
Component Status
Valves (BE)
Bradford Engineering BV pst-file with envelope on its way (smaller envelope) Electrical interface specification update (in specs doc)
21
Component status
Evaporator (NIKHEF) (shown in Tracker presentation)
However transport tubing on conical flange can reach T<-55 C (freezing) after 160 hours
22
23
Component status
Condenser safety conclusion (TWG meeting at NLR)
Transport tubing have to show leak before burst
approval required from safety panel
Advantage is that the condenser manifolds can go back to the old upper trunnion bridge locations with shorter (lower pressure drop) condenser lines
24
Condenser manifold locations at the inside of the USS upper trunnion bridges.
Primary TTCS
Secondary TTCS
25
Component status
Heat Exchanger (NLR)
EM manufacturing upto finalisation
QM design change agreed
during ground testing)
NLR Manufactured EM
Tin
Q1
T
1
Q2
Tout
26
Component Status
OHP-design (NLR)
Heaters selected
Thermal Modelling Mechanical design finalised
Heater Side
20 mm
Wire Heater
100 mm
20 mm
5 mm
27
Component Status
Accumulator (CAST)
Accumulator EM design
Pressure calculations
Wick calculations Structural design
28
Component Status
Accumulator (CAST)
EM manufacturing on-going
Accumulator shell
29
Safety Status
Pressurised systems table almost complete
Component information coming in APS, DPS, valves (TBD)
Mechanical
Mechanical material and component list far from complete (suppliers information needed) Structural analysis for box and components to be finalised
30