Академический Документы
Профессиональный Документы
Культура Документы
Manday
There are 20 point of stack in control and item test consist of : a. Total Particulate b. TRS as H2S c. HCL Gas d. CL2 Gas and CLO2 Gas e. CO, CO2, SO2, NO2 Gas
a. Total Particulate Is one of item test that to check amount of particle / dust after process plant. We control before sample was exit to air
b. Total Reduction Sulfur (TRS) This method purposed as information in analysis suspend of sulfur reduction that emission by fixed source, TRS was read as H2S Method used PQ/TM/1-135
NaOH
CaO
GL TANK
GRITS/DREGS
OXIDISE WL NaOH
SME LT 5
ASH
WEAK WASH 6
Condensate to environment
C. HCL, CL2, CLO2 Purpose of analysis for measurement total gas HCL, CL2, CLO2 are not used (Emission to air ambient) or residue from process
To Atmosfer
Strong
Cl2
HCl#3
Inst Air
To Gen
Weak
Cl2
Month
June July August September October November December AVG
Data
56 62 62 60 62 60 62 61
Accept
49 50 60 53 60 57 54 55
NA
7 12 2 7 2 3 8 6
%
87.5 80.6 96.8 88.3 96.8 95.0 87.1 90.3
Accomplishment of BOD5
100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 96.8 87.5 88.3 80.6 96.8 95.0 87.1
(%) Value
1
Data of BOD
2
Linear (Data of BOD)
4 Month
b. Sludge Lagoon This is used for control operation of waste water treatment Item test consist of : 1. MLSS 2. MLVSS
WASTE WATER TREATMENT PLANT & DIAGRAM FLOW Capacity : 110,000 M3/D (Up Date : 09-12-2011)
Pengabuan River
HCl
NaOH
Na-Hypo
Secondary Clarifier A
Influent waste water from mill Emerg. line Divertion tank Rt 2 hr, Vol =4784 M3 New Equalization tank DT C Vol = 85 M3 Rt 3 Hr Vol = 5024 M3 Primary Clarifier A
From WP
Defoamer
Log Wash
Vol = 5538 M3
Rt = 24 hr, Vol =50,000 M3 Cooling Tower M02 Aerated Lagoon A Rt 3.5 Hr Vol = 5538 M3 Effluent AB
Effluent Combined
A B C D
Cooling Tower M05 Rt 12 Hr, Vol = 30,000 M3 Aerated Lagoon B Secondary Clarifier B Vol = 85 M3 Primary Clarifier B 200 M3 Buffer tank Eastern Natural Lagoon (8 Ha, V=30,000 M3)
Primary Clarifier C
E F G
Rt 3 Hr Vol = 7850 M3 Vol = 5024 M3 Aerated Lagoon C Cooling Tower M05 (Project) Rt 12 Hr, Vol = 30,000 M3
Rt 3.5 Hr Vol = 5538 M3 Total Effluent Effluent C Secondary Clarifier C Pengabuan River Polymer Tank Rt 3.5 Hr Vol = 216 M3 Sludge Pit Belt Press Secondary Clarifier D Vol = 5538 M3 Effluent D
Sludge Thickener A
Sludge Thickener B
Vol = 50 M3
Rt 12 hr VOL =15,000 M3 V =2653 M3 Emergency Pond Remarks Transfer Pump Surface Aerators Direct Drive Mixer
Rt 12 hr V =2653 M3
Waste Water flow before tratment Waste Water flow after tratment Waste Sludge flow Vol Rt
Retention Time
C. Tungkal River Activity analyst for check quality of water river Up Stream 100m and Down Stream 100m from last of waste water treatment PT.LPPPI Item test consist of : BOD, COD, DO, Temperature, TSS, TDS, NaCl, pH, Conductivity, Free NH3 , CL2, Mn, Cr, Pb, As, Co, Hg, Fe, SO4-2, F-, Cn-, NO3- as N, NO2- as N, Cu.