Presented By : Putra B.

Manday

What is EQT .?????


Environmental Quality Team (EQT) is one of activity analysis which monitoring of environmental quality
Reference : KEP. 13/MENLH/3/1995, Lampiran IIB, IIIB PERMENLH No 21 Tahun 2008, Lampiran IB

Activity Analysis of EQT are


1. Air Emission Monitoring 2. Waste Water Monitoring 3. Solid Handling Monitoring

1. Air Emission Monitoring

There are 20 point of stack in control and item test consist of : a. Total Particulate b. TRS as H2S c. HCL Gas d. CL2 Gas and CLO2 Gas e. CO, CO2, SO2, NO2 Gas

1. Air Emission Monitoring

a. Total Particulate Is one of item test that to check amount of particle / dust after process plant. We control before sample was exit to air

Method used PQ/TM/1-167

1. Air Emission Monitoring

b. Total Reduction Sulfur (TRS) This method purposed as information in analysis suspend of sulfur reduction that emission by fixed source, TRS was read as H2S Method used PQ/TM/1-135

1. Air Emission Monitoring


LIME MUD FILTER CaCO3 LIME MUD WASHER CLARIFIED WL 9 WL TANK CAUSTICIZING WOOD CHIP 1 WL + Chip BL + Pulp NaOH cellulose Na-Lignate Na2S DIGESTER 2 BL BLOW TANK PULP WASHER BL TANK MCO2 REACTOR 3 P U PULP L P WB L EVAPORATOR HBL MIXING TANK 4 RECOVERY BOILER Organic S : S2-, S2O32- ,SO32- ,SO4 2Na2CO3 NaOH STEAM CaO 8 LIME KILN

GL + Lime = Lime mud + WL Na2CO3 + CaO + H2O CaCO3 + 2 NaOH

NaOH

CaO

GL TANK

GRITS/DREGS

Emission from SDT stack


Na2SO4 SO2 H2S 7 CLARIFIED GL

SLAKER / (MUD WASHER)

DISSOLVED SMELT WEAK WASH TANK

OXIDISE WL NaOH

SME LT 5

WASTE WATER Na2SO4 CRP syste m

Na2SO4 + Heat Na2S + 2 O2

ASH

Na2CO3 NaOH Na2SO4

WEAK WASH 6

Condensate to environment

Emission from RB stack

1. Air Emission Monitoring

C. HCL, CL2, CLO2 Purpose of analysis for measurement total gas HCL, CL2, CLO2 are not used (Emission to air ambient) or residue from process

INTEGRATED ClO2 PLANT

HCl Synthesis #3 Process description

To Atmosfer

Air Emission HCL

H2 NaOH N2 Demin water

Strong

Cl2

HCl#3

Inst Air

To Gen

Weak

Cl2

2. Waste Water Monitoring


Item test waste water monitoring consist of : a. BOD b. Sludge Lagoon c. Tungkal River

2. Waste Water Monitoring

a. BOD (Biochemical Oxygen Demand)


BOD is One of parameter quality of wastewater treatment, This is defined as the amount of oxygen required by bacteria while stabilizing in wastewater under aerobic condition

Method Used PQ/TM/1-39

Data Accomplishment of BOD5

Data from 7 month ago

Month
June July August September October November December AVG

Data
56 62 62 60 62 60 62 61

Accept
49 50 60 53 60 57 54 55

NA
7 12 2 7 2 3 8 6

%
87.5 80.6 96.8 88.3 96.8 95.0 87.1 90.3

Accomplishment of BOD5
100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 96.8 87.5 88.3 80.6 96.8 95.0 87.1

(%) Value

1
Data of BOD

2
Linear (Data of BOD)

4 Month

2. Waste Water Monitoring

b. Sludge Lagoon This is used for control operation of waste water treatment Item test consist of : 1. MLSS 2. MLVSS

Method used PQ/TM/1-43 (MLSS) PQ/TM/1-44 (MLVSS)

WASTE WATER TREATMENT PLANT & DIAGRAM FLOW Capacity : 110,000 M3/D (Up Date : 09-12-2011)
Pengabuan River

HCl

NaOH

Na-Hypo
Secondary Clarifier A

Influent waste water from mill Emerg. line Divertion tank Rt 2 hr, Vol =4784 M3 New Equalization tank DT C Vol = 85 M3 Rt 3 Hr Vol = 5024 M3 Primary Clarifier A

From WP

Defoamer

Urea & Phosfate Rt 3.5 Hr

Log Wash

Vol = 5538 M3

Rt = 24 hr, Vol =50,000 M3 Cooling Tower M02 Aerated Lagoon A Rt 3.5 Hr Vol = 5538 M3 Effluent AB

Effluent Combined

Rt 2 hr, Vol =4784 M3 Buffer Tank B

A B C D
Cooling Tower M05 Rt 12 Hr, Vol = 30,000 M3 Aerated Lagoon B Secondary Clarifier B Vol = 85 M3 Primary Clarifier B 200 M3 Buffer tank Eastern Natural Lagoon (8 Ha, V=30,000 M3)

Primary Clarifier C

E F G
Rt 3 Hr Vol = 7850 M3 Vol = 5024 M3 Aerated Lagoon C Cooling Tower M05 (Project) Rt 12 Hr, Vol = 30,000 M3

Rt 3.5 Hr Vol = 5538 M3 Total Effluent Effluent C Secondary Clarifier C Pengabuan River Polymer Tank Rt 3.5 Hr Vol = 216 M3 Sludge Pit Belt Press Secondary Clarifier D Vol = 5538 M3 Effluent D

Sludge Thickener A

Sludge Thickener B

Vol = 50 M3

Rt 12 hr VOL =15,000 M3 V =2653 M3 Emergency Pond Remarks Transfer Pump Surface Aerators Direct Drive Mixer

Rt 12 hr V =2653 M3

Waste Water flow before tratment Waste Water flow after tratment Waste Sludge flow Vol Rt

Nutrient & chemical dossing Volume

Sludge Cake transportation Land Filling

Retention Time

2. Waste Water Monitoring

C. Tungkal River Activity analyst for check quality of water river Up Stream 100m and Down Stream 100m from last of waste water treatment PT.LPPPI Item test consist of : BOD, COD, DO, Temperature, TSS, TDS, NaCl, pH, Conductivity, Free NH3 , CL2, Mn, Cr, Pb, As, Co, Hg, Fe, SO4-2, F-, Cn-, NO3- as N, NO2- as N, Cu.

3. Solid Handling Monitoring


E-Consignment Item Test Used ICP Equipment in PT.LPPPI are K, Pb, Cu, Cr, Cd, CO, Hg, Fe, As, Mn, Al