Boiler 9 & 10 - Structure

CEILING STRUCTUREGIRDERS,WBs,RBs

Drum In Boiler Cavity

Drum in lifted position-(Viewed from Top)

12 strands inserted in Bottom Anchors at two pts.

180 MT hydraulic jack & strand on cat beam & strand guide

CAT BEAM STRUCTURE

DRUM AT 9 M ELEVATION

STRANDS AT OTHER SIDE

DRUM AT 21 M ELEVATION

DRUM AT 35 M ELEVATION

DRUM AT 65 M ELEVATION

DRUM AT 75 M ELEVATION

DRUM ON TOP APPROX. 77M ELEVATION

DRUM IN POSITION WITH BACKGROUND OF VSTPP