Contents
Coal fired boilers Feeders Mills Fans Air Preheaters ESP
24 May 2012 2
24 May 2012
PA duct
Coal Feeder
Coal Mill
24 May 2012
F D Fan
P A Fan
Value 210 700 87.28 13.868 10.592 43.168 5570 167.2 154 540 38.8 540 2 2
Kg/cm2
0C
No. No.
No.
24 May 2012
TYPE OF BOILER
Based on steam parameter- Sub critical/ Supercritical Based on steam/ water circuit-Once through/ drum type
Based on air/ flue gas path- Tower/Two path Type of fuel- Coal fired/ oil fired
TYPE OF BOILER
Type of burner arrangement- Tangential/Front
24 May 2012
Cycle
for different types of cycle For typical conventional P.F. boilers, coal flow rate is
290-350 T/hr 120-145 T/hr
24 May 2012
24 May 2012
11
Configuration
24 May 2012
12
24 May 2012
13
Definition CRITICAL is a thermodynamic expression describing the state of a substance beyond which there is no clear distinction between the liquid and gaseous phase. The critical pressure & temperature for water are Pressure = 225.56 Kg / cm2 Temperature = 374.15 C
24 May 2012 14
Supercritical Cycle
24 May 2012
15
more than 2 % Decrease in Coal Consumption Reduction in Green House Gases. Overall reduction in auxiliary power consumption. Reduction in requirement of ash dyke land & consumptive water.
24 May 2012 16
Low thermal stress in Turbine . The startup time is less for boiler.
24 May 2012 17
Higher power consumption of BFP Higher feed water quality Requires more complex supporting
and framing in Boiler due to Spiral Wall tubes. Slight higher capital cost.
24 May 2012
18
T/HR
2225
1625
SH
STEAM PR
KG/CM2
0C
256
540 1742
179
540 1397.4
T/HR
0C
0C
RH STEAM TEMP
INLET
303.7
568 51.17
338.5
540 46.1
KG/CM2
0C
291.4
255.2
19
COST COMPARISON
FOR 660 MW vs. 500 MW
DESCRIPTION
3x660 MW 1970.73 Cr
2 Cost of ESP 153.00 Cr Total cost of Boiler + 3 ESP 2124.00 Cr 4 Boiler cost Per MW Cost of TG for entire 5 stage 1.07 Cr
1204.72 Cr 0.6Cr
634.31 Cr 0.63 Cr
20
24 May 2012
21
24 May 2012
22
24 May 2012
23
24 May 2012
24
Components
The Major components are :
24 May 2012
25
Feeders
Volumetric Type feeder Gravimetric Feeder
Chain Feeder Belt Feeder Table type belt Feeder
Chain Feeder
24 May 2012
26
24 May 2012
27
24 May 2012
28
Role of Mills
Produces Pulverized coal 70-75 % of which
passes through 200 mesh Air mixed with Pulverized coal (PF) is carried to the coal nozzle in the wind box assembly PF from coal nozzle is directed towards the centre of boiler burning zone Pre-heated secondary air enters boiler and surrounds the PF and help in combustion
24 May 2012 29
TUBE PRESSURIZED
MPS
24 May 2012
30
Medium Speed 30 to 100 Rev/min Bowl Mill, Ball and Race mill
24 May 2012
31
BOWL MILL
Model no. Base capacity(T/Hr) 18.4 26.4 33.8 36.5 51.1 54.1 68.1 72.0
BASE CAPACITY(T/HR) AT HGI -55 Total Moisture-10% Fineness-70% THRU 200 MESH
24 May 2012
32
24 May 2012
Rollers
24 May 2012
34
Model no.
Base capacity(T/Hr) 25 35 40 55 61 70 80
35
24 May 2012
36
Model no.
Base capacity(T/Hr) 83 90
BBD4760 BBD4772
24 May 2012
37
24 May 2012
38
Steel Balls
24 May 2012
39
24 May 2012
Burner Arrangement
24 May 2012
41
24 May 2012
42
Arrangement
24 May 2012
43
24 May 2012
45
HOT END
AXIAL SEAL
COLD END
HOT INTERMEDIATE
24 May 2012
46
24 May 2012
47
24 May 2012
48
24 May 2012
49
Regenerative Pre-Heater
Rotates with a low speed : 0.75 rpm. Weight : 500 tons. This consists of : rotor, sealing apparatus,
shell etc. Rotor is divided into 12 or 24 sections Each sector is divided into several trapezoidal sections with transverse division plates. Heat storage pales are placed in these sections.
50
24 May 2012
Cold End
24 May 2012
51
Heating Elements
24 May 2012
52
24 May 2012
53