MEPF works as a whole is one of the most vital and costly part of engineering disciplines in terms of project bidding, estimates and construction also testing and commissioning. MEPF occupied the 30% to 60% of a project construction cost of a building from commercial to industrial projects. That is why many businessman taking the opportunity of venturing the field specially in construction of supply and installation works of MEPF.
Registration requirements:
* DTI * LGU * SEC (if necessary) * other government institution * Registration to MEPF professional construction organization.
and
Proposed Office and Fabrication Site will be the CMED equipment division location site.
The FODC ELECTROMECH & FABRICATION DIVISION looking forward to be the most competitive MEPF Trade Con. and Supply Contractor in the market. The proponent dreams of making profit and staying long in the business.
Mechanical Works
HVAC WORKS Electrical Works Fire Protection Works
MEPF Small Project Group
Fabri-Duct
Year of Operation
Marketing Strategy
Business Plan
1. Company Registration to 1. Focus on MEPF works and various MEPF organization. Small Project Group. 2. Marketing Accreditation to 2. Penetration to industrial various commercial and Small project for FODC industrial establishments. accreditation. 3. Planning of Fabrication and 3. Strengthening the company product engineering. engineering capability. 1. Establishing the company product line. 1. Full marketing of MEPF Trade Work and Product line. 1. Promotion of FODC-EMFD product to the market. 2. Continuous Operation of MEPF Trade Work 1. Full operation of MEPF Trade Work and Product line.
PRESIDENT
VP-FODC-EMFD
SR . MANAGER FODC-EMFD
PRODN/FAB. DEPARTMENT
3 STAFF
MACHINERY AND EQUIPMENT: MEPF test Equipment Estimate Price: Fabrication Equipment Estimate Price: Transport Vehicle Estimate price: OFFICE AND MANUFACTURING PLANT: Office Renovation: Plant Construction: MISC., BUILDING MAINTENANCE & UTILITIES(5YRS.) Projected Annual Operation & Staff Salary: Legal Requirements and other fee (annual): 03.0M 19.0M 04.0M
= 26M
48.5M
ROI in Machinery and Plant 5yrs. Marketing Plan(Ave) Cash Out Flow Cash In Flow 40% increase/yr. Net cash Flow ROI per Year
Now
1st Year
2nd Year
3rd Year
4th Year
5th Year
Total
7.6 4
7.6 5 7 2
33.3%
38 38 54.7 16.7
5 1
-20.0%