STEP DESCRIPTION WHO

Originator
Work Permit Request in area under
1 (Issuing authority : CCC
PC&C control
or JV)
INITIATING EVENT

Generation of heat or sparkles of


sufficient magnitude and intensity to
NO YES
2 cause ignition of any flammable
material (internal combustion
COLD/ HOT engine, welding machines, electrical
PERMIT CHOICE
equipment,…)

If needed, raise in
parallel and attach to
the general permit a :
-Excavation permit
3 Raise a general Cold Raise general Hot Signs of :
Work Permit -Radiography permit Work Permit
RAISE Originator
-Vessel entry permit
(Issuing authority)
-Electrical Isolation
Clearance Disc. Supervisor
(Receiving authority)
Ensure that the
JV commissioning
4 workplace covered by
manager or his
the PTW is properly
PRELIMINARY
designee
prepared and safe to
CHECKING (Approving authority)
work

5 Release all specific Check the safety Release all the


On request :
certificate precautions, necessary actions for
PREPARATION equipment and process preparation
JV SHES
clothing required to (depressurization,
coordinator or
perform the work drainage, flushing…)
Supervisor
Ensure that training Attach marked-up P&ID (Safety authority)
has been carried out
to the workforce in
charge of the specific
task
6
Note any other
CHECKING + GAS precaution or warning
TESTING IF to be transmitted to
APPLICABLE the performing
authority

Perform (if required by Subcontractor HSE


the PTW) supervisor or JV
SHES supervisor
-Ambient gas test
(Safety authority)
-Confined gas test
Sign of :
JV area supervisors
The workplace is (Operating authority)
7 accepted Technician
ACCEPTANCE (Performing authority)

Stop the work and Completion of the


inform, if conditions have work
Technician
8 changed, the HSE Monitoring
Clean and housekeep (Performing
Issuing/Approving the working area and authority)
COMPLETION
authority who will restore all the safety
suspend the work conditions
Signs of :
Technician
Give authorization to re- (Performing authority)
9 energize in case of Closure of the PTW
Disc. Supervisor
Electrical Isolation Custody of the PTW (Receiving authority)
CLOSURE/
CUSTODY
Clearance Supervisor
(Operating authority)
Originator
(issuing authority)

SPF TKP OMIFPRO SNC