SFT 1945 1705 1630 1380 1630 1380 1790 1195 1195 1065
FLATS A1 A2 A3 A4 A5 A6 B1 B2 B3 B4
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SUDHAKAR (Structure)
ANIL (Block Work)
SANTHOSH (Pressure Test)
PRADEEP (Waterproofing)
JIPSON JOSEPH (Tiling)
1195 1195 1790 1945 1705 1630 1380 1630 1380
B5 B6 B7 C1 C2 C3 C4 C5 C6
7 30/06/2023 ### ### ### 7/7/2023 6/7/2023 7/7/2023 7/7/2023 8/7/2023 12/7/2023 8/7/2023 8/7/2023 8/7/2023 ### 5/7/2023 8/7/2023 8/7/2023 8/7/2023 10/7/2023
6 28/06/2023 ### ### ### 18-06-202316-06-2023 ### ### 26-05-202329-05-2023 ### ### ###
5 31-05-2023 ### ### ### ### ### 31-05-202330-05-2023 ### ### ### 15-05-202316-05-202320-05-202320-05-2023
4 18/05/23 15/05/23 27/05/23 03/06/23 02/06/23 02/06/23 28/05/23 26/05/23 27/05/23 05/06/23 17/05/23 16/05/23 14/05/23
3
2
1
Electrical works status
SFT 1945 1705 1630 1380 1630 1380 1790 1195 1195 1065 1195 1195 1790
FLATS A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 B7
17
16
15
14
13
12
11
10
9
8
7
6 10/072023 03/072023 03/072023 06/07/2023 27/06/2023
5 ### 01/07/2023 04/06/2023 05/06/2023 12/07/2023 27/06/2023 07/07/2023 20/06/2023 12/07/2023 07/07/2023 07/07/2023 07/07/2023
4
3
2
1
1945 1705 1630 1380 1630 1380
C1 C2 C3 C4 C5 C6
List of toilets
12/7/23
6/7/23 6/7/23 6/7/23 6/7/23 6/7/23
26/06/2023 27/06/2023 27/06/2023 27/06/2023 27/06/2023
22/06/2023 22/06/2023 22/06/2023 22/06/2023 22/06/2023
Tiles works status
SFT 1945 1705 1630 1380 1630 1380 1790 1195 1195 1065 1195 1195 1790 1945 1705 1630 1380 1630 1380
FLATS A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 B7 C1 C2 C3 C4 C5 C6
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2 10-7-23
1 3-7-23
completion
WIP B-107 Bedroom 1 toilet - 3/7/23 90%
B-107 Bedroom 3 toilet - 4/7/23 90%
B-107 Bedroom 2 toilet - 7/7/23 90%
24/05/2023 4/7/23
25/06/2023 25/06/2023 26/06/2023 7/7/23
8/7/23 8/7/23 24/06/2023 7/7/23
10/7/23 24/06/2023 24/06/2023 6/7/23
12/7/23 23/06/2023 13/7/23 24/06/2023 13/7/23 6/7/23 7/7/23