Вы находитесь на странице: 1из 1

BILL OF MATERIAL (PLATE 8 THK.) BILL OF MATERIAL (PLATE 16 THK.

)
TOTAL TOTAL TOTAL TOTAL
No. PIECE MARK PROFILE QUANTITY MATERIAL GRADE No. PIECE MARK PROFILE QUANTITY MATERIAL GRADE
LENGTH (MM) WEIGHT (KG) LENGTH (MM) WEIGHT (KG)
1 BX8-001 PL8*51 4 S355JR 1,654 5.265 1 BX16-001 PL16*372 4 S355JR 1,494 69.791
2 BX8-002 PL8*47 4 S355JR 1,652 4.87 2 BX16-003 PL16*373 2 S355JR 1,518 71.197
3 BX8-003 PL8*171 2 S355JR 344 1.259 3 CK16-001 PL16*140 8 S355JR 1,120 12.83

4 BX8-004 PL8*47 4 S355JR 1,652 4.869 4 CK16-002 PL16*200 8 S355JR 1,600 26.436

5 BX8-005 PL8*57 2 S355JR 460 1.645 5 CK16-003 PL16*140 8 S355JR 1,120 12.83
6 DB8-001 PL8*300 2 S355JR 350 7.91 6 FP16-001 PL16*190 2 S355JR 410 9.779

TOTAL 25.818 7 FP16-002 PL16*190 4 S355JR 2,660 63.445


1 8 FP16-003 PL16*190 2 S355JR 460 10.972
9 GS16-001 PL16*403 2 S355JR 2,352 101.929

BILL OF MATERIAL (PLATE 10 THK.) 10 GS16-002 PL16*320 24 S355JR 11,184 444.778


TOTAL TOTAL
No. PIECE MARK PROFILE QUANTITY MATERIAL GRADE 11 GS16-003 PL16*431 2 S355JR 2,523 121.519
LENGTH (MM) WEIGHT (KG)
1 BX10-002 PL10*70 4 S355JR 1,614 8.86 12 GS16-004 PL16*431 2 S355JR 1,761 87.847

2 BX10-003 PL10*71 4 S355JR 1,654 9.177 13 GS16-005 PL16*431 2 S355JR 1,762 87.855

3 SF10-001 PL10*81 4 S355JR 1,712 10.83 14 GS16-006 PL16*413 2 S355JR 2,598 117.527
4 SF10-002 PL10*88 2 S355JR 362 2.509 15 GS16-007 PL16*413 2 S355JR 1,598 74.282
5 SF10-003 PL10*81 2 S355JR 841 5.322 16 GS16-008 PL16*413 1 S355JR 789 36.62

6 SF10-004 PL10*81 2 S355JR 475 3.009 17 GS16-009 PL16*165 2 S355JR 640 13.343

7 SF10-005 PL10*81 2 S355JR 841 5.33 18 GS16-010 PL16*413 1 S355JR 789 36.62

8 SF10-006 PL10*75 16 S355JR 1,600 7.065 19 GS16-011 PL16*165 2 S355JR 640 13.338

9 SF10-007 PL10*60 3 S355JR 703 3.312 20 SF16-001 PL16*124 32 S355JR 12,716 167.246

10 SF10-008 PL10*81 2 S355JR 856 5.423 21 SF16-002 PL16*124 12 S355JR 4,481 59.038
11 SF10-009 PL10*75 16 S355JR 1,600 7.065 22 SF16-003 PL16*124 8 S355JR 3,108 40.89

12 SF10-010 PL10*144 2 S355JR 460 5.204 23 SF16-004 PL16*116 4 S355JR 1,553 18.986
13 SF10-011 PL10*81 1 S355JR 421 2.665 24 SF16-005 PL16*75 8 S355JR 1,200 8.164

14 SF10-012 PL10*72 4 S355JR 1,614 9.177 25 SF16-006 PL16*80 27 S355JR 2,311 17.572

15 SF10-013 PL10*81 14 S355JR 5,992 37.965 26 SF16-007 PL16*216 3 S355JR 647 12.748
16 SF10-015 PL10*234 2 S355JR 806 15 27 SF16-008 PL16*86 2 S355JR 250 2.688

17 SF10-016 PL10*81 4 S355JR 1,612 10.215 28 SF16-009 PL16*146 10 S355JR 1,894 30.414

18 SF10-018 PL10*60 10 S355JR 2,342 11.04 29 SF16-010 PL16*178 4 S355JR 708 10.73

19 SF10-019 PL10*134 2 S355JR 806 8.478 30 SF16-011 PL16*154 8 S355JR 2,987 57.78

20 SF10-020 PL10*81 4 S355JR 1,712 10.845 31 SF16-012 PL16*75 4 S355JR 600 4.082

21 WP10-001 PL10*403 4 S355JR 2,376 75.24 32 SF16-013 PL16*80 8 S355JR 685 5.206

22 WP10-002 PL10*397 2 S355JR 2,460 74.879 TOTAL 1848.482

23 WP10-003 PL10*397 2 S355JR 2,640 80.421

TOTAL 409.031

BILL OF MATERIAL (PLATE 12 THK.)


MARKING SHOULD BE READ
No. PIECE MARK PROFILE QUANTITY MATERIAL GRADE
TOTAL TOTAL
LENGTH (MM) WEIGHT (KG)
02P-01-PR-................
1 BX12-001 PL12*428 2 S355JR 2,558 103.136
2 BX12-002 PL12*305 4 S355JR 1,712 49.208
SLB RIL MEG
3 BX12-003 PL12*415 4 S355JR 1,712 66.927 PROJECT
4 BX12-004 PL12*428 2 S355JR 1,585 63.907 TRANSMITTAL : TR-382
ISSUED DATE : 19/09/2022
5 CK12-001 PL12*150 8 S355JR 1,200 9.733
COPY NUMBER :

6 SF12-001 PL12*240 64 S355JR 16,000 215.879 DEPARTMENT IFC IFI


1 CLIENT : SLB √
TOTAL 508.79 2 PM : VIJIL √
3 PE : AKHMAT / INDRA √
ARAVIND /
4 ENGINEERING : √
RMT
5 QA/QC. STR : √
6 QA/QC. EL : √
7 PROD. STR : MANAHAN √
8 PROD. EL : √

9 SUBCONT STR :

10 SUBCONT EL. :
NOTE :

RELIANCE INDUSTRIES LIMITED


KG-D6 ONSHORE TERMINAL PROJECT

APPROVED BY DATE
CLIENT APPROVED
ISS'D FOR CONSTR.
SCALE : 1:0 U.N.O Drawing Title
1 0 1 2 3 4 5 6 7 8 9 10m AREA-02 - 02P - 01
MODEL TEKLA REV.01 WEB PENETRATION 02P-1A/1B/1C
MODEL TEKLA REV.04 PRIMARY STEEL REVISED DUE TO CLIENT INPUT/ADDITIONAL COMMENTS 1 DEV RMT DRH 13/09/22 DO NOT SCALE THIS DRAWING. USE WRITTEN DIMENSIONS ONLY. PRIMARY STEEL FRAMING PLAN & ELEVATION - SHOP DRAWING
P-AS005-02P-SE-720-0016 PRIMARY STEEL FRAMING PLAN & ELEVATION - DESIGN DRAWING ISSUED FOR CONSTRUCTION 0 DEV RMT DRH 02/08/22 STATUS : Drawing No. REV.
REFERENCE DRAWING No. REFERENCE DRAWING TITLE REVISION DESCRIPTION REV. BY CHECK-PR CHECK-PR CHECK-E&I APPROVED DATE WEI-CM-00026-01-SD-4149_30 1

Вам также может понравиться