Академический Документы
Профессиональный Документы
Культура Документы
( )
,
.
2
Y
W S27.6 / 90
()
()
HY
27 . 6 90
Li ght
ni ngi
m pul
s er e
si
dua l vol t
ge
a
R a
t e dvol
t a
ge
un
de r nom i
na l di
c ha r g
s
e
c ur
e nt
r
kV
ofs ur g
ea r es
t er
kV
D i
st r
but e dt
i
ype
Wi t
hout ga
p
N om
na l di
i
s c ha r
ge c ur r
e ntkA
Pol ym
er i
c hous e
d
m
et
a l oxi
de
ur ge a
s
r r es
t e
r
kA
3
3.1 : -40 +40.
3.2 62, 48
3.3 2000.
3.4 35/.
3.5 7
3.6 . .
3 Operation conditions
3.1 Ambient temperature: -40+40.
3.2 Power frequency not more than 62 Hz, not less than 48 Hz.
3.3 Altitude (above sea level): not more than 2000m.
3.4 Max. Wind velocity: not more than 35m/s.
3.5 Earthquake intensity: areas below 7 degree.
3.6 Power frequency voltage applied between terminals of surge arrester shall
not exceed continuous operating voltage of surge arrester.
4
4.1 60099-4.
4.2 1
1
Rated
Continuo
Lightning
D.C.
Resistant
2ms
Vol.
us
impulse
1mA
current
square
operating
residual
Ref.
under
wave
Vol.
Vol. under
Vol.
current
operating
withstand
discharge
Vol.
kV
current
kV(r.m.s)
( r.m.s)
kV (Peak)
kV
continuous
nominal
A(Peak)
(A)
Y5WZ2-10/27
10
8.0
27
14.4
--
100
HY5WZ2-10/27
10
8.0
27
14.4
--
100
Y10W-182
182
146
495
255
--
800
Y10W-182
182
146
495
255
--
800
5
,
( ) .
,
.
,
,
, ,
.
,
,
, ,
, .
6.1 2, 1-4.
2
HY5WZ2-10/27
2855
104
Y10W-182
325015
306
Type
Fig.
Total Height H
mm
Max. OuterDiameter D
mm
HY5WZ2-10/27
2855
104
Y10W-182
325015
306
7
60099-4,
6.2
.
6.3 1
0,75 1. 1,
50A.
6.2 Check the outline of CMOA after unpacking. If pack is torn, please dont
use.
6.3 Measure the U1mA d.c and the leakage current under 0.75 U1mA d.c.
The U1mA d.c should fall within the requirements given in Table 1. The leakage
current under 0.75 U1mA d.c shoud be not more than 50A.
7 Acceptance test
9
9.1 , , ,
.
9.2 .
9.3 . .
9.3 .
9.4 2
.
10
:
a)
b)
c)
d)
8 Operation and Maintenance
8.1 Preventive test including measurement of voltage at 1 mA d.c (U1mA d.c),
leakage current at 0.75 U1mA d.c and insulating resistance is needed before
operation.
5
8.2 The period of preventive test is 5 years.
8.3 No need to clear in operation.
9 Notice
9.1 No collision in packing, storing, delivering, unpacking and installing
processes. If collision was happened, please check inside carefully to affirm no
damage. Then install and use after preventive test.
9.2 Keep the product clear, dry, free from corrosive gas and liquid before use,
please.
9.3 To guarantee the performance, please dont unpack by yourself.
9.4 The product is guaranteed for two years from delivery date under the correct
use.
10 Auxiliary
a)
b)
c)
d)
Quality Certificate
Directions
Packing list
Test report
11
11.1 , ,
, , , ,
.
11.2 .
11.3 , : ,
( 1000m ),
() ,
( ),
( ..)
, .
!:
,
, , .
11 Ordering data
6
3
11.1 Products name, model, code, system normal voltage, quantity, delivery
date, consignee, destination etc. of products.
11.2 Other auxiliaries.
11.3 Operation conditions such as ambient temperature, altitude (plateau type
can be adopted if altitude is more than 1000m), Min creepage distance site
pollution degree, anti-seismic demands (horizontal acceleration and intensity),
special demands of abnormal operation conditions (over humidly etc.). Order
accord with mutual agreement is allowed.
Respective customers
When the products are unusable, please recycle the products and other
auxiliaries and treat other un-recyclable materials properly to protect our
environment. Thank you.
Directions