Вы находитесь на странице: 1из 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

TENGIZCHEVROIL

SPECIFICATION

Doc W-ST-2000
. W-ST-2000
THIS IS A CONTROLLED DOCUMENT
NO UN-AUTHORISED MODIFICATIONS

.

WELDING, PWHT & NDE OF PIPING


,


This document is dual language. Ensure
both versions are modified.

. ,
.

Note 1: Issued prior to secondary review process implementation.


5

09-02-2009

43

YK

PH

DLK

28-10-2008

43

KR

SKH

JP

02-11-2000

17

CEB

TC

RW

03-10-2000

17

CEB

DJB

RW

18-02-2000

18

CEB

DJB

JKM

17-01-2000

18

CEB

DJB

JKM

REV

DATE

PAGES

BY

CHK

MGR

REVISIONS

PRELIM APPROVALS

SEE NOTE 1 ABOVE

CONST

REL

MAINT

OPS

FINAL APPROVALS
Page 1 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

REVISION DESCRIPTION SHEET



REV.

PARA.

GEN
.

REVISION DESCRIPTION

APPROVED FOR CONSTRUCTION
PARAGRAPH & TABLE REVISED
SPECIFICATION HEADER REVISED TO SHOW W-ST-2000
RE-FORMATTING OF DOCUMENT


W-ST-2000

APPROVED FOR CONSTRUCTION
PARAGRAPH & TABLE REVISED, SERVICE DETAILS NOW AS PER LINE
CLASS SPECIFIC FOR PROGRAM 12

12

, ,
12
APPROVED FOR CONSTRUCTION
TABLE REVISED, CORRECTIONS MADE TO DESIGN TEMP. FOR
CLASSES 150HDPE, 150HO4, 150HO5, 150PO9, & 300HO5 ONLY. ALL
DESIGN TEMPS. ARE NOW AS PER LINE CLASSES IN SPECIFICATION
X-000-L-2069 REV 7 OF 4/10/00. THESE ARE INDICATED BY (R3) IN
SERVICE COLUMN.

12

2.2.1
8.1.5
9.1.1
9.2.4
12

12
TABLE
14
5

12
TABLE


,
: 150HO4, 150HO5, 150PO9, &
300HO5.
,
X-000-L-2069 . 7, 4/10/00.
(R3).
DELETED

CORRECTED TYPO ERRORS



DELETED NOTE MAKING REFERENCE TO ATTACHMENT 1
, 1
REVISED NDE% FOR CDE SERVICE FOR LINE CLASS 150P01
NDE% CDE 150P01
REVISED NDE% FOR LINE CLASS 150P09, ADDED LINE CLASS 300PF
150P09, 300PF
DELETED NOTE MAKING REFERENCE TO ATTACHMENT
,
ADDED NEW LINE CLASS 150HDPE GAS
150HDPE GAS

Page 2 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

TABLE OF CONTENTS

1. SCOPE ........................................................................................................................... 4
2. APPLICABLE CODES & PROJECT SPECIFICATIONS ................................................. 4
3. PROCEDURE QUALIFICATION ..................................................................................... 5
4. WELDER QUALIFICATIONS .......................................................................................... 7
5. PREPARATION OF MATERIALS FOR WELDING.......................................................... 8
6. WELDING PROCESSES ................................................................................................ 9
7. WELDING ELECTRODES AND CONSUMABLES ........................................................ 10
8. PREHEAT, INTERPASS TEMPERATURE & POST WELD HEAT TREATMENT ........ 11
9. GENERAL WELDING REQUIREMENTS ...................................................................... 14
10.

INSPECTION AND TESTING..................................................................................... 15

11.

RADIOGRAPHY......................................................................................................... 17

12.

NON DESTRUCTIVE TESTING & HEAT TREATMENT PER LINE CLASS ............... 17

13.

HARDNESS TESTING OF PRODUCTION WELDS................................................... 20

14.

RECORDS ................................................................................................................. 21

Page 3 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

1.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

SCOPE
1.1

This Specification covers welding, heat treatment and non-destructive testing


procedures required for piping fabrication in a shop or on-site.

1.2

The following terminology is used within this Specification:


TENGIZCHEVROIL (TCO) A joint venture company between CHEVRON,
MOBIL and the Government of Kazakhstan.
SUPPLIER

Vendor, Seller, Manufacturer

CONTRACTOR
operations.

2.

Third party performing welding and other related

1.3

Applicable Specifications for this pipe fabrication are stated in the Request for
Bids, Purchase Orders and/or Contract, to which this Specification is a
supplement.

1.4

Pipe welded fabrication performed by CONTRACTOR on-site shall be


covered by an approved Welding Control Book (WCB).

APPLICABLE CODES & PROJECT SPECIFICATIONS


2.1

2.2

CODES
2.1.1

ASME B31.3

Chemical Plant and Petroleum Refinery Piping

2.1.2

ASME IX

Welding and Brazing Qualifications

2.1.3

ASME V

Non-Destructive Examination

STANDARD SPECIFICATIONS
2.2.1

DELETED

2.2.2

L-ST-2004 : Piping Fabrication Specification

2.2.3

L-ST-2003 : Piping and Material Classes

Page 4 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

3.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

PROCEDURE QUALIFICATION
3.1

General
3.1.1

Welding Procedures are welding procedure specifications (WPS)


accompanied by qualified welding procedure qualification records
(WPQR).

3.1.2

Only reviewed and accepted WPS, with qualified WPQR are to be


used for welding.

3.1.3

All welding procedure specifications (WPS) shall include welding


details and appropriate test results (WPQR) in accordance with
ASME IX and this Specification.

3.1.4

Qualification of all welding procedures for low temperature carbon


steel, and low temperature austenitic stainless steel, shall include
impact testing of both the weld and the HAZ in accordance with
ASME B31.3 Tables 323.2.2 and 323.3.1.

3.1.5

Qualification of P1 Group 1 to P1 Group 2 materials is required in


accordance with ASME IX QW-403.6 (Supplementary Essential
Variable for Impact Tested Materials)

3.1.6

When using impact tested materials with thickness less than


10mm, the test temperature for impact testing sub-size specimens
shall be calculated in accordance with ASME B31.3 Paragraph
323.3.4 (b). Where a test specimen has a width along the notch of
at least 80% of the material tested thickness, no reduction in test
temperature is required.

3.1.7

Qualification of welding procedures for sour service piping shall


include a hardness traverse of a polished and etched cross-section
of the weld. Hardness surveys shall be performed along two lines
parallel to the outer and inner surfaces of the weld approximately
2mm from each respective surface. Measurements shall be taken
in the weld metal, HAZ, and the base metal. Hardness values shall
be as follows:
Base Material Weld Metal & HAZ = 220 HV10 Maximum

3.1.8

A welding repair statement covering both shallow and full weld


thickness repairs shall be submitted for review and acceptance by
the TCO prior to commencement of work.

3.1.9

Any revisions to welding documents shall be submitted for review


and acceptance by the TCO

Page 5 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

3.2

3.3

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

Out Of Country (Tengiz) Work


3.2.1

SUPPLIER/ CONTRACTOR shall submit separate WPS, with their


appropriate WPQR, to TCO within the time stated in the Request
for Bids Purchase Orders and/or Contract, and prior to the
commencement of fabrication and/or welding.

3.2.2

SUPPLIER/ CONTRACTOR standard WPS/WPQR forms are


acceptable provided they meet the requirements and essential
variables of ASME IX. All documents submitted shall be fully
legible.

3.2.3

The SUPPLIER/ CONTRACTOR shall provide a summary chart


listing the applicable Welding Procedure (WPS and relevant
PQRs) for each piping class. Shall be submitted to TCO for
approval

3.2.4

The SUPPLIER\ CONTRACTOR is responsible for the submittal of


Sub-suppliers and/or Sub-contractors welding procedures to TCO.
The SUPPLIER shall review all SUB-CONTRACTOR welding
documents to ensure full compliance with TCO requirements,
before onward transmission to TCO for acceptance.

In Country (Tengiz) Work


3.3.1

CONTRACTOR shall submit separate WPS, with their appropriate


WPQR, to TCO prior to the commencement of fabrication and/or
welding.

3.3.2

CONTRACTOR shall provide a summary chart listing the


applicable Welding Procedure (WPS and relevant PQRs) for each
piping class and shall be submitted to TCO for approval.

3.3.3

New procedures shall be qualified in accordance with this


specification and the appropriate Project Work Instructions.

Page 6 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

4.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

WELDER QUALIFICATIONS
4.1

4.2

GENERAL
4.1.1

All welders shall be currently qualified to ASME IX.

4.1.2

For sour service piping all welders shall be qualified to a TCO


accepted welding procedure that meets the hardness requirements
of 3.1.7.

Out Of Country (Tengiz) Work


4.2.1

4.3

The SUPPLIER \ CONTRACTOR welder qualification records shall


be reviewed and accepted by TCO or his Representative. The
review and approval of the records shall be performed at the
SUPPLIER\ -CONTRACTORS works by TCO or his
Representative. Records shall NOT be submitted to TCO

In Country (Tengiz) Work By Contractor Or Sub-Contractors


4.3.1

All CONTRACTOR and Subcontractor welders shall be tested at


the TCO facility, or other TCO approved location, at the Tengiz
jobsite, the records shall be prepared by CONTRACTOR. Records
of TCO approved CONTRACTOR welders from other
Tengizchevriol projects shall be submitted to the project, for review
and acceptance, prior to transfer.

Page 7 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

5.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

PREPARATION OF MATERIALS FOR WELDING


5.1

All welding preparation details are to be in accordance with approved


Drawings, and WPS.

5.2

Carbon steel, low temperature carbon steel, and alloy material may be cut by
sawing, machining, or grinding.

5.3

Non-galvanized carbon steel, and low temperature carbon steel may be cut
by methods involving heating (i.e. flame or arc cutting) provided that the cut
edge is machined or ground back sufficiently to provide an acceptable fit up.
Flame cutting of alloy steels is not allowed.

5.4

Galvanized pipe shall be cut by cold sawing, grinding or machining only.

5.5

Surface defects in the pipe body shall be considered injurious if the defect
extends below the specified minimum wall thickness or is more that 1.5mm in
depth. Such defects shall be completely removed by grinding. If the remaining
wall thickness after grinding is less than the minimum specified wall thickness
(nominal minus mill tolerance), the pipe shall be rejected, or the section with
the defect shall be cut out. Weld repairs are not permitted to the pipe body.

5.6

All edges shall be accurate to design requirement with a smooth, even,


surface and all cutting dross, slag, etc, shall be removed with special care
taken to ensure no foreign matter remains inside the pipe.

5.7

All finished pipe bevel profiles shall be in accordance with ASME B16.25
paragraph 3.1 Figures 2a and 3a.

5.8

Grinding wheels for alloy steel shall be resin bonded alumina or silicon
carbide. Rubber bonded wheels shall not be used.

5.9

Only stainless steel wire brushes shall be used on stainless steel.

5.10

Grinding wheels, wire brushes and files shall be dedicated to a single material
type (i.e. carbon or stainless steel), and shall not be interchanged.

5.11

Inside diameters at the end of components to be joined shall be aligned within


ASME B31.3 requirements (1.5mm). Where misalignment is excessive the
thicker wall shall be trimmed in accordance with ASME B31.3 Fig. 328.4.3. In
no case shall such trimming result in a wall thickness less than the nominal
thickness specified minus the applicable mill tolerance. Caution is required in
the case or dissimilar strength materials, it may be preferred to increase the
thickness of the thinner component by buttering with weld metal to a TCO
accepted procedure. Particular cases shall be referred to TCO. Appropriate
and acceptable methods shall be used to achieve alignment.

Page 8 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

6.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

WELDING PROCESSES
The following Welding Processes are accepted for use:
6.1

6.2

Shielded Metal Arc Welding (SMAW)


Gas Tungsten Arc Welding

(GTAW)

Submerged Arc Welding

(SAW)

Specific Welding Process Limits


6.2.1

SMAW
6.2.1.1

Use of cellulosic electrodes is permitted for root passes


in groove and girth welds only. All other welding shall be
performed using basic coated hydrogen controlled
consumables. Rutile coated consumables shall be
limited to a maximum wall thickness of 12 mm. Above
this thickness basic coated consumables shall be used
for the entire weld, except where cellulosic consumables
are used for root passes.

6.2.1.2

The use of any other alternative welding process is


subject to TCO approval.

6.2.1.3

VENDOR/SUB-CONTRACTOR should clearly identify


the proposed welding process, work experience, level of
automation and metal transfer mode.

Page 9 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

7.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

WELDING ELECTRODES AND CONSUMABLES


7.1

All welding electrodes/consumables shall be subject to approval as part of the


WPS.

7.2

All welding consumables shall be supplied with Manufacturers Certification,


and shall be individually identifiable. All SMAW and GTAW consumables shall
be marked with specification and batch number. SAW, FCAW and GMAW
wires shall have identity marked on each wire spool.

7.3

The electrode/consumable chemistry shall meet the requirements of the base


material, and shall be selected such that the deposited weld metal exhibits
mechanical properties equal to or in slightly in excess of the base material.

7.4

Welding consumables used on carbon steel in sour service piping classes


shall not exceed a nominal Nickel content of 1.0% maximum.

7.5

All welding consumables shall, as a minimum, be stored and used in


accordance with the manufacturers recommendations. Electrode
reconditioning is permissible providing the consumable suppliers
recommendations are followed precisely.

7.6

Carbon steel and alloy electrodes/consumables shall be stored separately.

7.7

For submerged arc welding, alloying is not permitted via the flux.

7.8

Austenitic stainless steel welding materials for pressure boundary and local
bearing welds (pipe supports and anchors etc), shall produce deposits
containing delta ferrite within the following ranges based upon chemical
analysis and the WRC Delta Ferrite Diagram.
Non stabilised grades e.g. E308L, E316L

: 3FN to 10FN

Stabilised grades e.g. E347

: 5FN to 10FN

Page 10 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

8.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

PREHEAT, INTERPASS TEMPERATURE & POST WELD HEAT TREATMENT


8.1

8.2

8.3

Preheat
8.1.1

Minimum preheats shall be in accordance with that specified by


ASME B31.3 Table 331.1.1

8.1.2

Minimum Preheats shall be specified on the WPS, and shall be


maintained over a distance of 75mm on either side of the weld.

8.1.3

The minimum preheat temperature shall be maintained throughout


the welding cycle.

8.1.4

Minimum preheats shall also be used, to remove moisture from


weld preparations and also for tack welding.

8.1.5

When the ambient temperature is below 4C (40F) the minimum


preheat temperature shall be 38 C (100 F).

8.1.6

Preheat method shall preferably be electric resistance heaters,


controlled by thermocouples. Fuel gas heating shall be limited to
chill removal and drying operations only.

Interpass Temperature
8.2.1

Maximum interpass temperatures shall be stated on the WPS.

8.2.2

Maximum interpass temperature for austenitic stainless steels shall


not exceed 175 degrees Celsius, this includes dissimilar welds
between austenitic stainless steel and carbon steel. For carbon
steels the maximum interpass temperature shall not exceed 250
degrees Celsius.

Post Weld Heat Treatment


8.3.1

General
8.3.1.1

Post Weld Heat Treatment (PWHT) shall be performed


when indicated by the Piping Class, design drawings
and/or this Specification.

8.3.1.2

For Amine and Caustic Service piping classes, all


pressure retaining welds, and attachment welds to the
pipe, shall be PWHT.

8.3.1.3

PWHT shall be in accordance with B31.3 Table 331.1.1


and this Specification.

Page 11 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

8.3.1.4

PWHT requirements shall be clearly identified on the


WPS and relevant Drawings.

8.3.1.5

When required, PWHT shall be conducted at the range


detailed on the approved WPS for 1 hour per 25mm
(1.0) of thickness, but not less than 1 hour.

8.3.1.6

The use of fuel gas PWHT systems for heat treatments


outside of a furnace is not permitted. When furnace heat
treatment is used for PWHT of multiple welded items
then direct flame impingement is not permitted.

8.3.1.7

For local PWHT the width of the applied heating element


band shall not be less than :
BW = 5 x (R x t) 0.5 Where

BW = band width
R = pipe radius to midwall
t = pipe wall thickness

The minimum band width shall not be less than 4 inches


(100mm)
8.3.1.8

The width of insulation applied over the heating element


band shall not be less than
IBW = 10 x (R x t) 0.5Where

IBW = Insulation band


width
R = pipe radius to midwall
t = pipe wall thickness

8.3.1.9

Sufficient thermocouples to monitor PWHT temperatures


shall be attached by direct spot or resistance welding.

8.3.1.10 Pipework shall be adequately supported to prevent


distortion during heat treatment. If distortion does occur,
the situation shall be reported prior to any remedial
action.
8.3.1.11 Exothermic PWHT is not allowed.
8.3.1.12 No welding of any kind shall be carried-out on pressure
containing parts after final heat treatment.
8.3.2

Out of Country (TENGIZ) Work


8.3.2.1

A written PWHT procedure shall be submitted to TCO for


review and acceptance. The procedure shall include
essential details such as PWHT method, the procedure
Page 12 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

for calibration
thermocouples.
8.3.3

of

equipment

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

and

location

of

In Country (TENGIZ) Work by CONTRACTOR


8.3.3.1

A written PWHT procedure shall be submitted to TCO for


review and acceptance. The procedure shall include
essential details such as PWHT method, the procedure
for calibration of equipment and location of
thermocouples.

Page 13 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

9.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

GENERAL WELDING REQUIREMENTS


9.1

Welding Equipment
9.1.1

9.2

All equipment shall be maintained in good working order. Earth


connections shall make good contact with the work, calibration
checks shall be carried-out on all welding machines. Welding
machines shall have operating electrical condition indicators such
as ammeter and voltmeter, and there shall be portable metering
equipment available to check that welding procedures and
conditions are followed.

General
9.2.1

All welds shall be cleaned of foreign material (slag, etc) down to


clean metal, both on completion of each pass and when the weld is
finished.

9.2.2

Groove and girth welds shall be full penetration.

9.2.3

Limitations in B31.3 on weld reinforcement apply to internal as well


as external surfaces. Welds must be free from projections beyond
permitted reinforcement.

9.2.4

Permanently installed backing rings shall not be used. Root gap


inserts that are completely melted and fused in the weld bead are
acceptable provided that they have the same nominal composition
as the filler metal.

9.2.5

Single pass welding procedures are not acceptable

9.2.6

A minimum of Two passes shall be used on socket and seal welds.

9.2.7

Vertical-down welding shall not be used without written approval.

9.2.8

Weld peening is not permitted.

9.2.9

Arc strikes outside the welding groove shall be removed by disc


grinder, and minimum design wall thickness shall be maintained.

9.2.10

Any incidence of cracking in welds shall be reported to TCO. Welds


that have cracks may be repaired or cut out depending on severity.
A fully detailed repair/replacement procedure shall be submitted to
TCO for review and acceptance before repairs are made.

9.2.11

Two repair attempts only shall be permitted for any repair, following
this the complete weld shall be cut out and replaced.

Page 14 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

10.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

INSPECTION AND TESTING


10.1

General
10.1.1

Where inspection reveals a failure to meet design or code


requirements, the fabricator shall be responsible for such repairs
and further inspection as necessary to meet design or code
requirements.

10.1.2

All welds shall require recorded visual examination prior to any


other NDE. This key inspection activity shall be performed by a
qualified welding inspector All Inspection and Testing shall be
carried-out in accordance with ASME B31.3 and this Specification.
The minimum NDE percentage level per line class is indicated in
the Table at paragraph 12.

10.1.3

The fabricator shall be responsible to ensure that all welding and


NDE satisfy the requirements of this Specification.

10.1.4

All welds shall be uniquely identified for NDE examination and/or


records.

10.1.5

Where NDE level is less than 100%, the welds for NDE shall be
selected to cover the work of each welder or welding operator.

10.1.6

All NDE shall be performed by personnel qualified to a recognised


National or International Standard (e.g. PCN, ASNT Level II, etc.).

10.1.7

Branch connections shall be subject to complete visual examination


as per ASME B31.3 Paragraph 344.2 and magnetic particle or dye
penetrant examination of the final pass as per ASME B31.3
Paragraph 344.3 or 344.4. When specified on the piping class
sheets, ultrasonic examination shall be performed. Weldolets shall
have internal visual examination in all cases, Ultrasonic
examination may be applied in addition for branch sizes 100 mm
and above on a case by case basis at the discretion of the
Inspector. Generally UT shall be used as an aid to the visual
inspection specified and only when the thickness at the weld is over
19 mm.

10.1.8

All final non-destructive examination for acceptance shall be


performed after any post weld heat treatment and prior to
hydrostatic testing. NDE performed prior to PWHT (for materials
and line classes requiring PWHT) shall only be considered as
internal quality control.

10.1.9

Repairs to defects revealed by visual inspection shall be made


before any other NDE is applied.

Page 15 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

10.2

Doc No W-ST-2000 Rev 5


. W-ST-2000 . 5

Out of Country (TENGIZ) Work


10.2.1

10.3

Specification

NDE procedures, methods and techniques, shall be submitted to


TCO for review and acceptance. Any subsequent revision to the
documents shall also be submitted to TCO for review and
acceptance.

In Country (TENGIZ) Work by CONTRACTOR


10.3.1

NDE procedures, methods and techniques, shall be submitted to


TCO for review and acceptance. Any subsequent revision to the
documents shall also be submitted to TCO for review and
acceptance.

Page 16 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

11.

12.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

RADIOGRAPHY
11.1

All butt welds shall be subject to radiography. (Either random or 100%, as


specified in paragraph 12), to comply with the requirements of ASME B31.3.

11.2

Random radiography shall consist of radiography of the entire length of at


least 5% of the welds. i.e. one weld in twenty shall be 100% radiographed.

11.3

Welds for random radiography may be selected by TCO, selection shall be


such as to include a sample of each welders work, and cover all sizes used
within the line class.

11.4

ASME B31.3 Category D fluid service shall be inspected in accordance with


ASME B31.3 Paragraph 341.4.2.

11.5

All butt welds in Sour Service (NACE) including amine services shall be
radiographed 100%. Use ASME B31.3 Severe Cyclic Service acceptance
criteria.

11.6

Fluorescent intensifying screens are not permitted. .

11.7

Initial radiographs and written reports of interpretations shall be made as soon


as possible after completion of individual welds to permit evaluation of welder
skill and general weld quality in the early stages of fabrication.

11.8

For each welding procedure involving more than one welder, the first weld for
each welder shall be radiographed, these welds are in addition to the 5% or
other specified percentage.

11.9

The CONTRACTOR shall maintain an up to date record of radiographic weld


quality performance that shall indicate repair rates and quality performance of
individual welders.

NON DESTRUCTIVE TESTING & HEAT TREATMENT PER LINE CLASS


Piping Services Definition is as per Specification L-ST-2003(See also explanatory
notes following table.)

Page 17 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

LINE CLASS
(Socket & Butt
Welds)

DESIGN
TEMPC.

PIPE MATL.

P
No

PWHT

PT

150BO1

-20/+75

GRE

NO-

150HDPE

-40 /+40

HDPE

NO

150HDPE
GAS SKT
BUTT
(D)
150HO1 SKT
(A)
BUTT
150HO1 SKT
(B)
BUTT
150HO3 SKT
BUTT
150HO4 SKT
BUTT
150HO5 SKT
(A)
BUTT
150HO5 SKT
(B)
BUTT
150HOG SKT
BUTT
150H13 SKT
BUTT
150K01 SKT
BUTT
150K02 SKT
BUTT
150NO1 SKT
BUTT
150PF

-40 /+40

HDPE PE100

-46 /+300

A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6

150PF1 SKT
BUTT
150PO1 SKT
BUTT
150PO1 SKT
BUTT

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

NON
PRESS
ATTCH

SERVICE

100% Visual

N/A

100% Visual

N/A

NO

100%
Visual
and (D)

N/A

As line class
As line class (R3)
As line class

NO

1
1

YES
ALL
NO

NO

-46/+100

A333-6& A671CC60/22
A333-6

NO

-46/+100

A333-6

-46/+300

A333-6

YES
ALL
NO

-46/+230

A333-6

NO

-46/+400

A333-6
&
A671-CC60/32
A333-6
&
A671-CC60/22
A312-316L
A358-316L
PTFE
lined
LTCS(A333-6)
A312-316L
A358-316L
A312-316L
A358-316L
A312-316L
A358-316L

ALL
LTCS
ALL
LTCS
ALL
LTCS
ALL
LTCS
ALL
LTCS
ALL
LTCS
ALL
LTCS
ALL
TLCS
ALL
LTCS
LTCS

YES
ALL
YES
ALL
NO

No

No

No

No

5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
100% 0
0
100%
100% 0
0
100%
100% 0
0
100%
100% Visual
Mech. Joint
5%
0
0
5%
5%
0
0
5%
100% 0
0
100%

-46 /+300
-46 /+300
-46/+140

-46/+200
-140
to
+200
-46/+100
-46/+100
-46/+230
-46/+230

150PO9 SKT
BUTT
150PO9 SKT
BUTT
150PE10

-140 to
+210
-140 to
+210
-40/+40

A312-316L
A358-316L
A312-316L
A358-316L
HDPE

No

No

NO

300HO1 SKT
(A) BUTT
300HO1 SKT
(B) BUTT
300HO2 SKT
BUTT
300HO3 SKT
BUTT
300H04 SKT
BUTT
300HO5 ALL
BUTT
300K01 SKT
BUTT

-46/+300

A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6

NO

1
1

YES
ALL
NO

NO

NO

1
1

-46/+300
-46/+350
-46/+350
-46/+120
-46/+100
-46/+300

A333-6
&
A671-CC60/22

RT

5%
0
100%
0
100%

0
5%
0
100%
Visual

YES

5%
0
5%
0
5%
0
5%
0
5%
0
0%

YES
ALL

100%
0

EXCEPT CDE
CDE DIETHANOLAMINE
(BELOW 70C.)

As line class
As line class (R3)
EXCEPT CC,CCS &

(R3)

DHC

CC, CCS & DHC (R3)

As line class
As line class
As line class
As line class

SS

As line class

Clamp

As line class

SS

As line class

SS

EXCPT CDE- (R4)

SS

CDEDIETHANOLAMINE
(R4)
FCC & WF (R4)

SS
SS

EXCEPT
(R4)

FCC & WF

N/A

As line class

0
5%
0
5%
0
5%
0
5%
0
5%
5%

LTCS

EXCEPT CDE

LTCS

CDE DIETHANOLAMINE
(BELOW 70 DEG.C.)

LTCS

As line class

LTCS

As line class

LTCS

As line class

LTCS

As line class (R3)

0
100%

LTCS

As line class

Page 18 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

LINE CLASS
(Socket & Butt
Welds)

DESIGN
TEMPC.

PIPE MATL.

P
No

PWHT

PT

300K02 SKT
BUTT
300N02 SKT
BUTT
300P09 SKT
BUTT
300 PF

-46/+300

A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A312-316L

1
1

YES
ALL
NO

NO

NO

600HO1 SKT
(A) BT ,<14in
600HO1 SKT
(C) BT, >14in
600HO1 SKT
(B)
BUTT
600KO1 SKT
BUTT
600KO2 SKT
BUTT
600KO9 SKT
BUTT
600L01 SKT
(A) BT, <14in
600L01 SKT
(C) BT, >14in
600NO1 SKT
BUTT
600PO9 SKT
BUTT
900HO1

-46/+400

NO
<19mm

YES
>19mm

YES
ALL
YES
ALL
YES
ALL
YES
ALL

-85/+120

PTFE
lined
LTCS(A333-6)
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-6
&
A671-CC60/22
A333-3

9B

NO
<19mm

-85/+120

A333-3

9B

YES
>19mm

-110 to
+120
-46/+120

NO

NO

-46/+70

A312TP316L&
A358TP316L
A312TP316L&
A358TP316L
A333-6

NO

100
0
0
100
100% 0
0
100%
100% 0
0
100%
100% Visual
Mech. Joint
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
100% 0
0
100%
100% 0
0
100%
100% 0
0
100%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
5%
0
0
5%
0
100%

900KO1

-46 /+375

A333-6

900KO2

-46 /+375

A333-6

GOST

-46 /+300

LTCS

YES
ALL
YES
ALL
NO

-46/+300
-110 to
+100
-46/+100

-46/+400
-46/+400
-46/+300
-46/+300
-46/+90

1
1
1

RT

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

NON
PRESS
ATTCH

SERVICE

LTCS

As line class

LTCS

As line class

316SS

As line class

Clamp

As line class

LTCS

As line class

LTCS

As line class

LTCS

As line class

LTCS

As line class

LTCS

As line class

LTCS

As line class

3.5Ni

As line class

3.5Ni

As line class

316SS

As line class

316SS

As line class

LTCS

100%

LTCS

As line class
As line class

100%

LTCS

As line class

5%

LTCS

As line class

Notes : SKT = Socket Weld joints, BUTT and BT = Butt Weld Joints
(A) = Case A - No PWHT up to 12in NB,
(B) = Case B All sizes require PWHT
(C) = Case C PWHT only for over 14in NB
(D) = SKT electro fusion welds, BUTT heat fusion welds, ultrasonic test of butt
welds as per 4.03-01-2003, 42-103-2003

Page 19 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

13.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

HARDNESS TESTING OF PRODUCTION WELDS


13.1

Shop and Field Production Welds


13.1.1

For Sour Service, and when Post Weld Heat Treatment is required
due to thickness, 100% of all shop and field production welds shall
be hardness tested. (This does not include Caustic Service Classes
in 150H01 & 300H01). All hardness testing shall be done after
completion of PWHT.

13.1.2

Hardness testing for production welds only applies to the bulk weld
metal.

13.1.3

Acceptance criteria shall be 200BHN (220Hv10) maximum.

13.1.4

Any weld with a value above this shall be re-tested at 3 additional


locations and a written non-compliance report, detailing all of the
values obtained, shall be issued to the COMPANY Inspector for
disposition. Unless otherwise accepted by the COMPANY, the weld
shall be heat treated again, and repeat tested for hardness. If the
weld still fails to meet the hardness requirement it may be subject
to rejection by the COMPANY Inspector, and shall then require
replacement.

13.1.5

On tested welds that are cap welded by more than one welder,
each welders weld deposit shall be sampled.

13.1.6

Hardness shall be measured by Telebrineller, Equotip or Microdur.

13.1.7

Equotip and Microdur values shall be the average of 5 readings at


each location.

13.1.8

The testing equipment used shall be correctly calibrated on known


similar metal samples immediately prior to the test session and
repeated again after the session.

13.1.9

This operation shall be witnessed by COMPANY representative.

Page 20 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

14.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

RECORDS
14.1

Records relating to welding and NDE shall be maintained on a daily basis. A


computerised data storage system is preferred, such that all data pertaining
to welding, NDE and quality is available and is updated daily. The output data
may be used as part of the final documentation package required for each
piping system.

14.2

All procedures and records relating to welding and NDE shall be available for
review upon request.

Page 21 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

1. ..................................................................................................... 20
2. ............................................... 20
3. .............................................................................. 20
4. ..................................................................................... 21
5. ..................................................................... 22
6. ...................................................................................................... 30
7. ........................................... 30
8. ,
................ 30
9. ................................................................................. 20
10. ......................................................................................... 21
11. ............................................................................................................. 22
12. 3 .............................................. 30
13. ................................................................. 30
14. ....................................................................................................... 30

Page 22 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

1.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


1.1

,
,
..

1.2

:
() ,
, .
, ,
,
.

2.

1.3


, /
, .

1.4


,
().


2.1

2.2

2.1.1

ASME B31.3

2.1.2

ASME IX

2.1.3

ASME V


2.2.1

2.2.2

L-ST-2004:

2.2.3

L-ST-2003:

Page 23 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

3.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


3.1

3.1.1

-
(WPS),

(WPQR).

3.1.2

WPS
WPQR .

3.1.3

(WPS)

(WPQR) ASME IX
.

3.1.4



,
323.2.2 323.3.1 ASME B31.3.

3.1.5

1 , 1 2,
ASME IX QW-403.6 (

).

3.1.6


10 ,


323.3.4 (b) ASME B31.1. ,
,
80%
, .

3.1.7


, .
,

. 2
.
,
:

Page 24 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

,
220
(HV10) .

3.2

3.3

3.1.8

3.1.9

()

3.2.1

,
, /
/ .

3.2.2

SUPPLIER/ CONTRACTOR standard WPS/WPQR forms are


acceptable provided they meet the requirements and essential
variables of ASME IX. All documents submitted shall be fully
legible.

3.2.3

WPS/WPQR
/
,

ASME IX.

.

3.2.4

/
/
.

.

, ()
3.3.1


(WPS),
(WPQR) / .

3.3.2

) .
.

3.3.3



.
Page 25 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

4.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


4.1

4.2


4.1.1


ASME IX.

4.1.2

,
, . . 3.1.7

()

4.2.1

4.3

/

/.
.

,
()

4.3.1



,
,
.
,

,

.

Page 26 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

5.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


5.1

5.2

,
.

5.3


(
) ,

. .

5.4


, .

5.5

,

1,5 .
.
(
),
. .

5.6


,
, .n.,
.

5.7


3.1 ASME 16.25, . 2 3.

5.8


.
, .

5.9

5.10

,
(..
)
.

5.11


ASME B31.3
(1,5 ).
. 328.4.3 ASME B31.3.


Page 27 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

.

, .
.

.

Page 28 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

6.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


:
6.1

(SMAW)
(GTAW)
(SAW)

6.2


6.2.1

(SMAW)
6.2.1.1



.

.

12 .
12
,
,
.

6.2.1.2

6.2.1.3

-
,
,
.

Page 29 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

7.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


7.1


, (WPS).

7.2


.

(SMAW) (GTAW)
.
(SAW, FCAW GMAW)
.

7.3


,
,
,
.

7.4

,
, ,
, , 1,0%.

7.5

, ,
.
.

7.6

7.7

, .

7.8

,
,
( , .)
-
- WRC.
(308(L), E316(L)): 3
10
(, 347):

5
10

Page 30 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

8.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

8.1

8.2


8.1.1


331.1.1 ASME 31.3.

8.1.2


(WPS),
75
.

8.1.3

8.1.4

8.1.5

4" (40"F),

38"
(100"F).

8.1.6


, .

.

8.2.1


(WPS).

8.2.2


175"
, ,
.

250".

Page 31 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

8.3

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


8.3.1

8.3.1.1


,
,
/ .

8.3.1.2

,
,
,
.

8.3.1.3


331.1.1 831.3 .

8.3.1.4

8.3.1.5

,
,
,
1 25 (1,0")
, 1 .

8.3.1.6


, ,
.

,

.

8.3.1.7

()
:
BW = 5 x (R x t) 0.5

BW =
R =

t =

- 4
(100 )

Page 32 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

8.3.1.8

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

,
, :
IBW = 10 x (R x t) 0.5

IBW =

R =

t =

8.3.1.9

8.3.1.10

.
,
-
.
8.3.1.11
.
8.3.1.12 -

.
8.3.2

. ()
8.3.2.1

8.3.3



.
:
,
.

,
()
8.3.3.1



.
:
,
.

Page 33 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

9.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


9.1

v
9.1.1

9.2


.
,
.

, ,

,
.


9.2.1


( .n.) ,
,
.

9.2.2

9.2.3

, 31.3
, ,
. ,
.

9.2.4

.
,

,
.

9.2.5

9.2.6

9.2.7

9.2.8

9.2.9


.
,
.
Page 34 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

9.2.10


.
.

.

9.2.11

,
.

Page 35 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

10.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


10.1


10.1.1

,
,

.

10.1.2

-
.
.

ASME 31.3 .

. 12.

10.1.3

10.1.4

/

.

10.1.5

,
100%,
, n
.

10.1.6

(, PCN,
ASNT , ..).

10.1.7


. 344.2 ASME 31.3
. 344.3
344.4 ASME 31.3.
, .
""
. 1 00

.


, 19
.

Page 36 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

10.2

Doc No W-ST-2000 Rev 5


. W-ST-2000 . 5

10.1.8

(
, )
.

10.1.9

, ,

. v ()
10.2.1

10.3

Specification

,

.
.

. ( )
10.3.1

,

.
.

Page 37 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

11.

12.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

11.1

(
, 100%-, . 12)
ASME 31.3.

11.2

, ,
5% , .. 20
100%.

11.3

,

.

11.4

, D ASME
31.3, 341.4.2 ASME 31 .3.

11.5

, (NACE),
, 100%.
- ASME 31.3 .

11.6

11.7



,
,
.

11.8

, ,
,
. 5%-
.

11.9

,


.


L-ST-2003 (.
).

Page 38 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

C.

150BO1

-20/+75

150HDPE

-40 /+40

150HDPE GAS

(D)
150HO1

(A)

150HO1

(B)

-40 /+40

100

-46 /+300

A333-6
A671CC60/22
A333-6
A671CC60/22

A333-6


(

)

150HO3

-46 /+300

-46 /+300

100%
.
100%

100%

(D)


(R3)

5%
0

0
5%

5%
0

0
5%

5%
0

0
5%

5%
0

0
5%

150HO4

-46/+140

150HO5

(A)

-46/+100

A333-6
A671CC60/22

A333-6

Doc No W-ST-2000 Rev 5


. W-ST-2000 . 5

(PWHT)

Specification

5%
0

0
5%

CDE

( 70C.)


(R3)

CC,CCS &

DHC
(
,
,

)

(R3)
150HO5

(B)

150HOG

-46/+100

-46/+300

A333-6

A333-6

5%
0

0
5%

5%
0

0
5%

5%
0

0
5%

100%
0

0
100%

100%
0

0
100%

100%
0

0
100%

100%
.
.
5%
0
0
5%

150H13

-46/+230

150K01

-46/+400

150K02

-46/+200

150NO1

-140
+200

A333-6
A333-6
A671CC60/32
A333-6
A671CC60/22
A312-316L
A358-316L

,
,

(R3)

150PF

-46/+100

PTFE .
LTCS(A333-6)

150PF1

-46/+100

A312-316L
A358-316L

Page 39 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5

C.

-46/+230

A312-316L
A358-316L

5%
0

0
5%

CDE- (R4)

-46/+230

A312-316L
A358-316L

100%
0

0
100%

CDE

(R4)

-140
+210

A312-316L
A358-316L

5%
0

0
5%

.

. (R4)

150PO9

-140
+210

A312-316L
A358-316L

100%
0

0
100%

. (R4)

150PE10

-40/+40

100%

300HO1

(A)
300HO1

(B)
300HO2

300HO3

BUTT
300H04

300HO5

-46/+300

A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6

5%
0

.
0
5%

CDE

A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6
A671CC60/22
A312-316L


(

)
150PO1

(PWHT)

150PO1

150PO9

-46/+300

-46/+350

-46/+350
-46/+120
-46/+100

300K01

-46/+300

300K02

-46/+300

300N02

-46/+300

300P09

-110
+100

300 PF

-46/+100

600HO1
(A) BT
,<14in
600HO1

(C) BT, >14in


600HO1

(B)

600KO1

-46/+400

-46/+400
-46/+400
-46/+300

5%
0

0
5%

CDE

( 70C.)

5%
0

0
5%

5%
0

0
5%

5%
0

0
5%

0%

5%

100%
0

0
100%


(R3)

100
0

0
100

100%
0

0
100%

100%
0

0
100%

PTFE .
LTCS(A333-6)

A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6
A671CC60/22
A333-6
A671CC60/22

<19

100%
.
.
5%
0
0
5%

316

>19

5%
0

0
5%

5%
0

0
5%

100%
0

0
100%

Page 40 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,


(

)
600KO2

-46/+300

A333-6
A671CC60/22
A333-6
A671CC60/22
A333-3

100%
0

0
100%

100%
0

0
100%

9B

5%
0
5%
0
5%
0

0
5%
0
5%
0
5%

3.5 Ni

-46/+90

600L01
(A) BT, <14in
600L01
(C) BT, >14in
600NO1

600PO9

900HO1

Doc No W-ST-2000 Rev 5


. W-ST-2000 . 5

C.

600KO9

Specification

-85/+120

(PWHT)

-85/+120

A333-3

9B

<19

>19

-110 to
+120

5%
0

0
5%

-46/+70

A312TP316L

A358TP316L
A312TP316L

A358TP316L
A333-6

100%

900KO1

-46 /+375

A333-6

100%

900KO2

-46 /+375

A333-6

100%

-46 /+300

5%

-46/+120

3.5 Ni
316

316

: =
=
(A) = A - 12

(B) = B
(C) = C
14
(D) =
, ,
4.03-01-2003 , 42-103-2003.

Page 41 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

13.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


13.1

,
13.1.1

,
,
, - ,
. (
, . 15001 30001.)
, .

13.1.2

13.1.3

: 200 BHN (220 Hv 10)

13.1.4




.

.
,

.

13.1.5

On tested welds that are cap welded by more than one welder,
each welders weld deposit shall be sampled.
, ,

.

13.1.6

Telebrineller,
Equotip Microdur.

13.1.7

Equotip Microdur
5 .

13.1.8

13.1.9

Page 42 of 43

TENGIZCHEVROIL

SPECIFICATION FOR WELDING, PWHT & NDE OF PIPING


,

14.

Specification

Doc No W-ST-2000 Rev 5
. W-ST-2000 . 5


14.1

,
. , ,

.
.

14.2

,

.

Page 43 of 43

Вам также может понравиться